<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: What Does it Cost to Build an OP Loftbed These Days?</title>
	<atom:link href="http://www.oploftbed.com/blog/2008/08/what-does-it-cost-to-build-an-op-loftbed-these-days/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.oploftbed.com/blog/2008/08/what-does-it-cost-to-build-an-op-loftbed-these-days/</link>
	<description>Weblog for the OP Loftbed Company</description>
	<lastBuildDate>Fri,  3 Sep 2010 00:47:18 -0400</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.2</generator>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
		<item>
		<title>By: Shane Hartzler</title>
		<link>http://www.oploftbed.com/blog/2008/08/what-does-it-cost-to-build-an-op-loftbed-these-days/comment-page-1/#comment-9264</link>
		<dc:creator>Shane Hartzler</dc:creator>
		<pubDate>Wed, 11 Aug 2010 05:17:07 +0000</pubDate>
		<guid isPermaLink="false">http://www.oploftbed.com/blog/?p=39#comment-9264</guid>
		<description>I think that the last full sized loft bed I bought the rough lumber was $150 and the hardware was about $50 so $200 total.  This was fall 2009.</description>
		<content:encoded><![CDATA[<p>I think that the last full sized loft bed I bought the rough lumber was $150 and the hardware was about $50 so $200 total.  This was fall 2009.</p>
]]></content:encoded>
	</item>
</channel>
</rss>
